AirTek is a leading provider of engineering, construction, and maintenance services for air pollution control (APC) equipment in a wide range of industries including power generation, pulp and paper, petrochemical, rock products, and steel. We specialize in providing turnkey solutions for precipitator design, engineering, erection, and maintenance.

Following is a brief summary of some of our projects:

Smurfit Corporation Florence, SC

  • New precipitator with inlet duct work, slide gates, and prefabricated control room on a combination fuel power boiler.
  • Turnkey scope included engineering, material, erection, low voltage wiring, insulation, and lagging.

Smurfit Corporation Brewton, AL

  • New precipitator with inlet slide gates, outlet stacks, and ash handling system on a combination fuel power boiler.
  • Turnkey scope included engineering, material, erection, low voltage wiring, insulation, and lagging.

Weyerhaeuser Company Campti, LA

  • New precipitator with support steel and material removal system on a recovery boiler.
  • Scope included engineering and material supply.

Georgia Pacific Corporation Palatka, FL

  • Rebuild one oil fired and one combination fuel fired boiler precipitator.
  • Fill empty field including electric impulse rappers and a transformer rectifier on oil fired unit.
  • Supply collecting plates and rigid electrodes on combination fired unit.

Weyerhaeuser Company Valliant, OK

  • Lime kiln precipitator installation and supply of foundations, support steel, ductwork, black liquor system, and new electrical substation.
  • Turnkey scope included precipitator erection, low voltage electrical work, piping, and project management.

Weyerhaeuser Company Valliant, OK

  • Recovery boiler precipitator installation and supply of foundations, support steel, ductwork, black liquor system, and electrical substation.
  • Turnkey scope included precipitator erection, all low voltage electrical work, piping, project management, and demolition of existing precipitator.

Weyerhaeuser Company Pine Hill, AL

  • Rebuild a recovery boiler precipitator. Scope included engineering and replacement of inlet ductwork.
  • Turnkey scope included engineering, material, erection, low voltage wiring, insulation, and lagging.

Smurfit-Stone Corporation Hopewell, VA

  • Rebuild of the combination fuel fired boiler precipitator.
  • Convert to rigid electrodes, supply collecting plates, rappers, transformer rectifier sets and controls, and major plenum repairs.
  • Turnkey scope included engineering, material, erection, low voltage wiring, insulation and lagging.